Plan Factory’s city planning studio for parcel intelligence, entitlement coordination, review routing, environmental drafts, hearings, conditions, and records.
Draft-only, fail-closed workspace. Rule-pack blueprints are catalogued for City of Sacramento, Sacramento County, and California. All remain disabled pending source extraction, authorized legal/planning validation, launch testing, and Founder approval. UI actions are never agency actions.
Activation control
Disabled
Controlled by Founder approval through governed backend feature flags.
UI authority: noneBlackBox receipts required
Jurisdiction intelligence
0
Published rule packs available
Source geometry preservedNo fabricated facts
Review posture
Fail closed
Unverified parcel data and rule packs remain unresolved—not inferred.
Staff review required
Permit Engine
Backend service · inactive until activation
Jurisdiction rule-pack evaluator
The backend evaluates only published, versioned rule packs against supplied source-backed facts. Every result carries its ordinance source, rule-pack version, effective date, calculated and required values, confidence, unresolved data, and exception pathway.
Published packs onlyJurisdiction match requiredSource cited resultsDraft comparison only
Permit Agent Triad
Backend-owned drafts only · inactive until activation
01 · Parcel Scout
Collects source-backed parcel, GIS, plan, geometry, and document context. Preserves source geometry and makes missing data visible.
No fact fabricationNo boundary changes
02 · Entitlement Navigator
Prepares configured rule-pack comparisons, likely pathways, standards checks, and exception routes as reviewable drafts.
No determinationsRule packs required
03 · Record Steward
Coordinates review packets, comments, hearing materials, conditions drafts, and BlackBox receipts for staff review.
No filing or noticesReceipts required
City Planning Studio workspaces
Permission-scoped once activated
Lifecycle coordination
01
Applicant portalOnboarding, parcel lookup, document checklist, resubmittals, notices, and case status.
DRAFT
02
Planner & reviewer workspaceCompleteness, referrals, comments, plan comparison, staff-report and findings drafts.
DRAFT
03
Commission & public portalAgendas, public documents, comments, speakers, motions, votes, and decision records.
CONTROLLED
04
Environmental, conditions & handoffCEQA/NEPA draft workflows, mitigation tracking, appeals, inspection handoff, and records.